Licensed Septic Installers in Lee County, Texas

10 verified contractors serving Lee County · Typical job: $6,000–$15,000 · License-verified via TCEQ-OSSF

A new aerobic septic system in Lee County averages $8,000–$15,000. Every installer below is verified against the TCEQ OSSF licensing database.

Get 3 quotes for septic install & repair in Lee County

Free, no obligation. We route to featured, license-verified pros.

  • TCEQ-OSSF verified
  • 10 pros serving Lee County
  • Free — no contact required
  • Your info never resold

All Verified Providers

Septic Install & Repair service area in Lee County

Cities & towns served
Giddings, Lexington, Dime Box
ZIP codes covered
78942 · 78947 · 77853
Nearby areas
Metros: Austin, College Station, Bastrop
Adjacent counties: Bastrop, Williamson, Milam, Burleson, Washington, Fayette

About septic install & repair in Lee County

Septic systems in Texas are regulated as On-Site Sewage Facilities (OSSF) by the Texas Commission on Environmental Quality (TCEQ). Rural acreage across Central Texas overwhelmingly requires aerobic treatment units (ATUs) rather than conventional gravity septic — the region's thin soil profiles over limestone and clay make conventional drainfields infeasible on most tracts. Every new install starts with a site evaluation by a licensed OSSF professional, a soil analysis, and a design submitted to your county's Designated Representative (DR) or authorized agent for permit approval before any dirt moves. Installation itself takes 1–3 days, but the full timeline from soil test to final inspection typically runs 4–8 weeks depending on county workload.

Local factors in Lee County

Lee County's sandy soils are among the most forgiving in the region for septic — many tracts still qualify for conventional gravity systems. Design costs and permit timelines are lower than Hill Country counties.

What drives the cost of septic install & repair

  • System type — conventional gravity ($5,000–$8,000) vs aerobic ($8,000–$15,000+)
  • Soil profile — rocky, shallow, or high-clay soils increase excavation and material costs
  • Distance from house to system location — longer sewer lines cost more
  • Number of bedrooms — 3-bed vs 5-bed changes tank size and drainfield sizing
  • Required electrical (aerobic systems need a dedicated 120V line and alarm panel)

Permits, licensing, and process

Every OSSF installer must be TCEQ-licensed (Installer II is standard). The process: (1) site evaluation and soil analysis by a licensed designer, (2) system design and permit application to your county DR, (3) permit approval and installation, (4) final inspection and TCEQ registration. Aerobic systems also require a two-year maintenance contract at install — Texas law mandates ongoing monitoring for as long as the system is in service.

Common mistakes to avoid

  • Not getting a soil test first — some tracts cannot support a septic system at all, and finding out after buying is expensive
  • Choosing a designer and installer from different companies without coordination — miscommunication causes rework
  • Skipping the required maintenance contract — TCEQ can fine unmaintained aerobic systems
  • Installing on a small tract without checking minimum lot-size rules — some rural areas require 1+ acre

What to ask every contractor

  • What is your TCEQ Installer II license number?
  • Will you handle the site evaluation and design, or do I need a separate designer?
  • What system brands do you install and what is the warranty?
  • Who provides the required 2-year maintenance contract, and what does it cost annually?
  • Do you handle the county permit application, or is that on me?

Best time of year

Winter (December–February) is typically the fastest scheduling window for new installs. Late spring and early fall have the highest demand from new-build customers.

Frequently asked questions about septic install & repair in Lee County

How much does a septic system cost in Lee County?
A conventional (gravity) septic system runs $6,000–$12,000 installed in Lee County. Aerobic treatment units (ATUs) with sprinkler dispersal — required in poorly draining soils common in Hill Country — run $12,000–$18,000 plus $200/year maintenance. Soil evaluation and TCEQ permitting add $500–$1,200. Every quote should specify the OSSF type (conventional vs aerobic) and include the site evaluation cost separately.
Who is licensed to install a septic system in Texas?
Only TCEQ-licensed OSSF Installers (Class I or II) can legally install septic systems in Texas. Every installer on this page holds an active TCEQ license — verified from the TCEQ OSSF licensee database. Unlicensed installers cannot get your system permitted, and unpermitted systems create title problems when you sell the property. Always ask for the license number and check it at TCEQ.
How long does septic installation take?
From site evaluation to functional system, expect 4–8 weeks. The soil evaluation (perc test) takes 1–2 weeks, TCEQ permitting adds 2–3 weeks, and actual excavation and installation runs 3–5 days. Aerobic systems take slightly longer because the electrical and control panel need county inspection. Schedule installations for spring or fall — summer heat can slow tank curing.
Do I need a septic tank inspection before buying rural land?
Yes. If the property has an existing septic system, ask for a licensed OSSF Site Evaluator to inspect and provide a written report before closing. Costs $300–$600. Missing or failing systems can cost the buyer $10,000+ post-close. Every TCEQ-licensed installer on this page can either perform the inspection themselves or refer to a licensed evaluator.
What is the difference between conventional and aerobic septic?
Conventional (gravity/drain field) septic works when your soil percolates well — sandy or loamy soils absorb effluent naturally. Aerobic Treatment Units (ATUs) actively aerate and treat wastewater before dispersal, then spray-irrigate the treated effluent. Aerobic is required by TCEQ when soils are too tight (clay-heavy Hill Country), lots are too small, or water table is too high. Aerobic costs more upfront and requires annual maintenance contracts.

Have a question we haven't answered? Ask when you request a quote.